Air Leak Loss Simulator

Simulate the annual loss amount and improvement potential from factory air leaks.

Enter Simulation Parameters

Enter your factory information. An estimated loss amount will be calculated.

units
kW
hrs/day
days/year
JPY/kWh
25%
10%

Simulation Results

Annual Total Electricity Cost -- 10K JPY
Loss from Air Leaks -- 10K JPY/yr
Savings from Improvement -- 10K JPY/yr
CO2 Reduction -- t-CO2/yr
Annual Potential Savings
-- 10K JPY
Reduction Rate 0%

* This simulation provides approximate values. Actual results may vary depending on factory conditions.
* CO2 emission factor: 0.000441 t-CO2/kWh (published by the Ministry of the Environment) is used.

Cost Comparison: Before vs. After Improvement

--
Before
--
After

For accurate diagnosis and improvement proposals, please feel free to contact us.

Free Consultation